The right process for every part
your wingman to hybrid manufacturing
Additive, subtractive and formative, seven technologies under one roof, picked per part and freely mixed. Tell the matchmaker below what you’re making, or browse the sheets straight from the drawer.
18Years
7Processes
1Roof
The matchmaker
Not sure which
three questions. honest answers.Set the three dials and watch the ranking argue it out live. It’s the same logic our engineers run in their heads, minus the chai.
01 What’s it made of?
roughly speaking.
02 How many?
drag it. economics shift fast.
50parts
Comfortable volume range per process · lit = in range at your quantity
03 What matters most?
pick your hill to die on.
Live ranking
the verdict.
your picks, ranked, on one page.
+ Post Processing · Quality Control
whichever wins, it ends here. finished, then proven.
The flat-file drawer
Nine sheets
pull one out.
01 Additive · grown layer by layer
DMLS
metal, the smart way
±0.2 mm · 1–500 parts · 5–15 days
Open sheet →
SLA / DLP
detail, dialled in
25 micron layers · 1–100 parts · 1–5 days
Open sheet →
MJF
production, not prototypes
0.3 mm walls · 1–10k parts · 3–7 days
Open sheet →
SLS
no supports, free geometry
0.7 mm walls · 1–5k parts · 3–7 days
Open sheet →
02 Subtractive · carved from solid
CNC
tight as a drum
±0.01 mm · 1–10k parts · 5–14 days
Open sheet →
03 Formative · cast + moulded
Vacuum Casting
weekend production turnaround
15–30 / mould · 15–200 parts · 5–10 days
Open sheet →
Injection Moulding
cents per part
±0.05 mm · 1k–1M+ parts · 5–60 s cycles
Open sheet →
04 Post-processing & QC · finish it, then prove it
The extra mile
blast · paint · polish · mark, all under one roof.
4 paint booths · heat treat · AS9100D · ISO 13485
Open sheet →
Proof in microns
aerospace + medical grade QC, measured, not assumed.
ZEISS CMM · FAI AS9102 · AS9100D · ISO 13485
Open sheet →